Brick Paver Installation & Edging



Staging of material

Many paver tasks will vary depending on gain access to, website conditions, project size and of course, the weather. Mindful factor to consider ought to be taken to identify the time to begin the paver installation.

The foreman or job supervisor should constantly have the materials (sand/ pavers) dispersed around the task website for efficient and easy setups. Paver pallets/bundles need to be placed in a manner not to interfere with the paver installation. The correct pallet/bundle placement can make the real project installation simpler and quicker by minimizing the total labor of handling the material.

Brick paver patterns

Pavers can be put in several patterns depending upon their shape. Each paver shape will normally have several different hatch patterns that are offered by the producer.

Contractors need to take into consideration the traffic weight loads on their paver projects. In many applications around the world, it has actually been revealed that pavers laid in a herringbone pattern have carried out effectively.

Pavers that are 60 mm (2 - 3/8 in) density appropriate for pedestrian applications. Pavers that are going to be used in industrial or commercial applications need to be 80 mm (3 - 1/8 in) in density.

Reference/starting point for brick paver installation

There are a number of conditions that identify the beginning point of a paver project.

When starting to set up pavers it is best to snap a real straight chalk line on the surface of the bedding sand or pull a true straight string line above the surface area of the bed linen sand at the ended up elevation of the pavers This will assist as a guide for keeping straight joint lines and will likewise allow the installer to make adjustments in the positioning of the pavers.

Buildings and concrete curbing are normally not straight and need to not be utilized for developing straight joint lines. Making use of string lines is necessary to identify the true straightness of the edge too. As the paver installation advances, the string lines will help minimize the requirement for small trim pieces.

Joint width in between pavers ought to be in between 1/16 and 3/16 in (2 and 5 mm ). There are some pavers with spacer bars on their sides. These will preserve a minimum joint width and allow the bedding and jointing sand to get in between each paver. Pavers with spacer bars are typically not laid in snug versus each other because a string line will provide consistent joint spacing.

Installation of brick pavers.

One of the most commonly utilized methods for the installation of pavers is hand installation of each paver. It is best to set up a single row of pavers along one of the true straight lines that you have actually pulled or above the bed linen sand. The best approach is to put a paver versus another one and let it move down into the bed linen sand.

When installing pavers on a high grade, they should be set up at the base of the grade going uphill. This will avoid the pavers from creeping as they are being laid.

The best way for setting up pavers on big tasks is to install them mechanically. There are a couple products a professional must consider before installing pavers mechanically:

1.) Mechanical installers are only capable of setting up pavers in particular patterns.

2.) The specialist should ensure that the producer is capable of manufacturing and bundling pavers in the desired pattern on the pallets for simple mechanical installation.

Poor color blending could result in an irregular looking installation. A lot of producers are consistent with color blending on each package of pavers, however it is the professional's responsibility to ensure correct mixing in the field.

Cutting procedures for brick pavers.

Contractors typically have 2 methods of cutting pavers. Pavers are cut either by 1). A double bladed guillotine or by 2). A gas powered cut off saw or brick saw which is equipped with a diamond blade. The diamond blade cut-off saw or brick saw will provide a much cleaner and more precise cut. A lot of brick saws will have a pipe accessory on them which will permit the operator to cut the pavers damp. When cutting pavers damp, it will assist reduce dust and will prolong the diamond blades life. The operator of the brick saw need to constantly cut the pavers away from the surface of the paver field when cutting damp, due to the fact that the pavers will create a slurry that will stain the paver surface area. Pavers that are cut must not fit tight, adequate spacing should be readily available for jointing sand.

The brick saw operator must always use the appropriate protection that is required for operating a saw, such as eye, ear, breathing and hand security ).

Edging types

Edge restraints play a major function in the overall success of an interlocking pavement installation Edging restraints remove lateral motion of the pavers and hold the pavers tightly together. Specifically at the outer perimeter of the paver application, without an edging restraint, your job is guaranteed to stop working gradually.

Normally produced edge restraints are the most frequently used by professionals. Manufactured edging restraints can vary from, plastic edging, steel and aluminum, timbers or precast concrete and stone.

Edging installation.

When installing your edge restraint, it needs to rest directly on top of the compressed gravel base. The compacted gravel base course should extend a minimum of 6in beyond the boundary of the pavers This will provide a correct foundation upon which the edging restraint can sit. Made edging (i.E. Plastic, steel or aluminum) ought to be strongly anchored into the compacted gravel base( contact the producer's literature for the advised spacing of the spikes). There are some edging restraints that will extend deeper into the gravel base or beyond the base course (i.E. Timbers or poured-in-place curbs ). Edging restraints need to never be positioned directly on top of the bed linen sand. This could lead to the migration of the bedding sand and eventual lateral motion of the pavers. Geo textile fabric is advised if there is a possibility of losing bedding sand in between the pavers and the edge restraint. When a gap in between the pavers and the edging goes beyond 3/8" (10mm), then the area ought to be filled with cut pavers. All edging applications need to be correctly back filled after they are set up to help offer extra stability.

Compaction of brick pavers.

After installation, the pavers need to be compacted. The whole area that is to be compacted need to be swept clean of any foreign items and particles that can cause scuffing or scratching on the surface of the pavers.

It is important to have a compactor that can exert between 3000lbs. And 5000 lbs. Of centrifugal compaction force. In addition, it is very important that the very first compaction takes place prior to any jointing sand has actually been applied to the pavers. If jointing sand is applied to the pavers before compaction occurs, this can cause a bridging problem and will not enable the joints to be entirely filled with jointing sand. Tree Service Del Ray Beach This can also prevent the pavers from being effectively set into the bedding sand.

When condensing the pavers, it is recommended that you make at least 2 passes in various directions across the pavers. This will enable the pavers to be properly embeded in the bedding sand and will require the bedding sand up into the joints from the bottom of the pavers.

The compaction of the pavers is extremely crucial to the final performance of the pavers. Failure to do proper compaction can lead to contortions and pavement failure over time.


Paver pallets/bundles should be placed in a way not to interfere with the paver installation. One of the most commonly used methods for the installation of pavers is hand installation of each paver. The operator of the brick saw should constantly cut the pavers away from the surface of the paver field when cutting damp, due to the reality that the pavers will produce a slurry that will stain the paver surface area. Edging restraints get rid of lateral movement of the pavers and hold the pavers securely together. When a space in between the pavers and the edging exceeds 3/8" (10mm), then the area needs to be filled with cut pavers.